Configurator of Actuators ZPA Pečky, a.s.

MTNED 52442

Electric linear thrust actuator with electronic control system, protective enclosure IP55. Range of tripping force setting: 11,5 to 25kN.

Current configuration type number:

Additional positions for type number combination:

AElectronic system DMS2ED – contact-less switch control. Electric connection: Terminal board.

0Pitch of pillars: 160mm, position Closed: 30mm. Pillars version: with nut, thread in clutch: M20x1,5.
1Pitch of pillars: 160mm, position Closed: 30mm. Pillars version: with nut, thread in clutch: M16x1,5.
2Pitch of pillars: 160mm, position Closed: 30mm. Pillars version: with nut, thread in clutch: M10x1.
3Pitch of pillars: 160mm, position Closed: 30mm. Pillars version: threaded flange, thread in clutch: M20x1,5.
4Pitch of pillars: 160mm, position Closed: 30mm. Pillars version: threaded flange, thread in clutch: M16x1,5.
5Pitch of pillars: 160mm, position Closed: 30mm. Pillars version: threaded flange, thread in clutch: M10x1.
6Pitch of pillars: 160mm, position Closed: 74mm. Pillars version: with nut, thread in clutch: M20x1,5.
7Pitch of pillars: 160mm, position Closed: 74mm. Pillars version: with nut, thread in clutch: M16x1,5.
8Pitch of pillars: 160mm, position Closed: 74mm. Pillars version: threaded flange, thread in clutch: M10x1.
9Pitch of pillars: 160mm, position Closed: 74mm. Pillars version: threaded flange, thread in clutch: M20x1,5.
APitch of pillars: 160mm, position Closed: 74mm. Pillars version: threaded flange, thread in clutch: M16x1,5.
BPitch of pillars: 160mm; Poloha zavřeno: 74mm. Pillars version: threaded flange, thread in clutch: M10x1.
CPitch of pillars: 150mm, position Closed: 30mm. Pillars version: with nut, thread in clutch: M20x1,5.
DPitch of pillars: 150mm, position Closed: 30mm. Pillars version: with nut, thread in clutch: M16x1,5.
EPitch of pillars: 150mm, position Closed: 30mm. Pillars version: with nut, thread in clutch: M10x1.
FPitch of pillars: 150mm, position Closed: 30mm. Pillars version: threaded flange, thread in clutch: M20x1,5.
GPitch of pillars: 150mm, position Closed: 30mm. Pillars version: threaded flange, thread in clutch: M16x1,5.
HPitch of pillars: 150mm, position Closed: 30mm. Pillars version: threaded flange, thread in clutch: M10x1.
IPitch of pillars: 150mm, position Closed: 74mm. Pillars version: with nut, thread in clutch: M20x1,5.
JPitch of pillars: 150mm, position Closed: 74mm. Pillars version: with nut, thread in clutch: M16x1,5.
KPitch of pillars: 150mm, position Closed: 74mm. Pillars version: with nut, thread in clutch: M10x1.
LPitch of pillars: 150mm, position Closed: 74mm. Pillars version: threaded flange, thread in clutch: M20x1,5.
MPitch of pillars: 150mm, position Closed: 74mm. Pillars version: threaded flange, thread in clutch: M16x1,5.
PPitch of pillars: 150mm, position Closed: 74mm. Pillars version: threaded flange, thread in clutch: M10x1.
RPitch of pillars: 150mm, position Closed: 130mm. Pillars version: threaded flange, thread in clutch: M20x1,5.